Automating a drinking-water filtration plant
A filtration and pumping plant of a municipal water utility, taken from manual valve operation to automatic filtration and filter washing on Wonderware System Platform in 2010–2011. Alexey Malyshev, then at the utility's systems integrator, led his department's work on the upgrade and wrote the vendor's published success story.
The site
One of the main drinking-water works of a large municipal water and sewerage utility. The works has a first-lift pumping station, a mixing chamber with chemical dosing, horizontal sedimentation tanks, blocks of rapid gravity filters, clear-water tanks, a second-lift pumping station and a UV disinfection station.
Where it started
- Most of the plant dated from the 1970s. Valves no longer shut off reliably: operators confirmed a closure by looking through inspection hatches or watching the flow out of the sedimentation tanks.
- Starters and switchgear were obsolete, overcurrent protection had been desensitised, and limit switches did not show clearly whether a valve had closed.
- To avoid damage, limit switches were set to stop valves before they seated. After each filter wash, staff finished the shut-off by hand at the valve, judging by sound or by time. All of this cost the utility a lot to run.
What the utility wanted
- Reliable operation of the works and the operating procedures followed
- Less wear on rapid filters, valves and pumps
- Lower energy and material costs
- No incidents caused by human error or unsafe operating modes
- Treatment modes set from online analysers and adjusted quickly from laboratory results
- Automatic diagnostics of the control equipment
Stage 1: see what is happening
Instruments and the electrical protection of the drives were restored. New metering covered the flow into the clear-water tanks and the levels in the filters and tanks. A plant-wide monitoring system was built on System Platform, and its history began to show where incidents clustered and where the operating procedures were not followed. That data decided which equipment to replace first. Reports and day-to-day decisions came from Historian, ActiveFactory and Excel with VBA and .NET.
Stage 2: let the system run the process
Monitoring became automatic control: the system collects the data, makes the decisions and drives the equipment. The stage coincided with an extension of the works, so 1970s equipment refurbished in stage 1 now runs alongside modern digital actuators (AUMA) and instruments, all behind one operator interface. Filtration and rapid filter washing were handed to the PLCs and System Platform, which took human error out of the key operations.
How the system is built
- Level 3Central control room
Application Server with about 4,700 digital and analogue points, Historian, and operator stations that show the whole works.
- Level 2Area computers
InTouch for System Platform in each area: a local control room, data from the PLCs, and a local history store that keeps the data if the link to the server drops.
- First-lift pumping
- Mixing and dosing
- Sedimentation and rapid filters
- Second-lift pumping
- UV disinfection
- Level 1PLCs and instruments
Controllers, actuators and analysers on the process.
Screens use ArchestrA graphics built from object templates, which suits large mimics with many similar elements. Trends and reports come from Historian through ActiveFactory and Excel.
Result
- Instruments restored: operators get timely, reliable data on the process
- The operating procedures are followed more closely
- The history pointed to the equipment behind the largest costs, and it was replaced with modern, reliable units
- Filtration and rapid filter washing run automatically
- The published success story reports a payback of 1 year and 7 months for the new equipment, its installation and the software
The same work, done offline for you
Today we build FDS, I/O schedule, PLC and SCADA code and a FAT pack run on an emulator, for your engineers to review and accept.
This page is our own summary of the software vendor's success story for this project, published in November 2011 (original).